Wooden Stick Bridge
Advanced Solid Mechanics Project
Oct 2022 - Dec 2022
Objective
Design and build a bridge made out of off-the-shelf wooden sticks and adhesives. The bridges were to be built within strict dimensions and a maximum budget of $20. The bridges were given marks for its max load, max energy, and bridge weight. Grading of the teams were given according to the best performing bridge.
Methodology
Multiple tests utilizing the UTM for tensile, compression, and bending tests were conducted. These were needed to find properties of the individual wooden sticks and to ensure the different orientations and lamination techniques were of the highest strength.
For the loading condition, a Universal Testing Machine (UTM) would apply the load to the center of the bridge. As the marking scheme was a ratio of bridge performance to bridge weight, the belief was that referencing current bridge designs were not the right approach as bridges experience loads across the length of the entire bridge. Topology optimization was utilized to remove these unnecessary trusses creating the lightest bridge possible.
Due to our topology optimization approach, starting with the restriction box for the bridge was the most logical approach.
The software chosen to perform this topology optimization was SolidWorks. This was due to limited time for the design phase, availability of the software, and ease of use. It was understood that SolidWorks could not optimize for the maximum strength (chose stiffness instead) and did not provide the highest Finite Element Analysis (FEA) accuracy. Our group decided that these shortcomings did not outweigh the benefits.
After numerous simulations, varying cell sizes and boundary conditions, the geometry above show the optimized load bearing structure. As indicated earlier, the structure did not look like a traditional bridge design as the load conditions of this bridge differed from the loading conditions experienced in a real bridge.
In its raw optimized geometry, the bridge could not be easily manufacturable. The geometry was remodeled and FEA was conducted on the remolded geometry before manufacturing.
The bridge geometries needed to be validated so multiple bending tests were conducted on small frame designs. It was assumed that Sample 3's max load and energy should be closer to Sample 2 if Sample 3 had the same number of sticks and width. It was found that Sample 3 had the highest stiffness of the three designs which correlated the simulations goals.
The rules dictate that a small car must be able to travel across the span of the bridge. To satisfy this requirement, a thin floor composed of a single ply of sticks were built across its length. To increase adhesive strength at each joint, the sticks were interlaced and glued at each layer.