Wooden Stick Bridge

Advanced Solid Mechanics Project

Oct 2022 - Dec 2022

Raw optimized wooden stick bridge design
Objective
Design and build a bridge made out of off-the-shelf wooden sticks and adhesives. The bridges were to be built within strict dimensions and a maximum budget of $20. The bridges were given marks for its max load, max energy, and bridge weight. Grading of the teams were given according to the best performing bridge.
Methodology
Multiple tests utilizing the UTM for tensile, compression, and bending tests were conducted. These were needed to find properties of the individual wooden sticks and to ensure the different orientations and lamination techniques were of the highest strength.
Bridge restriction box showing dimensions and allowed areas
For the loading condition, a Universal Testing Machine (UTM) would apply the load to the center of the bridge. As the marking scheme was a ratio of bridge performance to bridge weight, the belief was that referencing current bridge designs were not the right approach as bridges experience loads across the length of the entire bridge. Topology optimization was utilized to remove these unnecessary trusses creating the lightest bridge possible.
Due to our topology optimization approach, starting with the restriction box for the bridge was the most logical approach.
The software chosen to perform this topology optimization was SolidWorks. This was due to limited time for the design phase, availability of the software, and ease of use. It was understood that SolidWorks could not optimize for the maximum strength (chose stiffness instead) and did not provide the highest Finite Element Analysis (FEA) accuracy. Our group decided that these shortcomings did not outweigh the benefits.
Raw optimized wooden stick bridge geometry
After numerous simulations, varying cell sizes and boundary conditions, the geometry above show the optimized load bearing structure. As indicated earlier, the structure did not look like a traditional bridge design as the load conditions of this bridge differed from the loading conditions experienced in a real bridge.
Manufacturable bridge redesign for assembly
In its raw optimized geometry, the bridge could not be easily manufacturable. The geometry was remodeled and FEA was conducted on the remolded geometry before manufacturing.
Small frame bending test sample Graph of small frame test results
The bridge geometries needed to be validated so multiple bending tests were conducted on small frame designs. It was assumed that Sample 3's max load and energy should be closer to Sample 2 if Sample 3 had the same number of sticks and width. It was found that Sample 3 had the highest stiffness of the three designs which correlated the simulations goals.
The rules dictate that a small car must be able to travel across the span of the bridge. To satisfy this requirement, a thin floor composed of a single ply of sticks were built across its length. To increase adhesive strength at each joint, the sticks were interlaced and glued at each layer.
In-construction photo of the bridge assembly
Unfortuately, while nearing the end of the manufacturing process, there were not enough sticks to complete the solid floor that was initially planned due to the restriction in costs. Instead, only three beams were placed under the floors. As notching the sticks were not allowed, positive stops could not be implemented in the floors. The shear failure was expected.
Results
The bridge was placed on a UTM and loaded until the machine reached an extension of 30 mm where the structure would have reached "failure".
Max Load: 2246.5 N/230 kg, Max Energy: 30.53 kJ, Weight: 0.435 kg. Overall Top Three best performing bridge out of 30 groups.